The Cloud was designed originally as 'Party Central' for the 2011 Rugby World Cup. Woods Glass worked with Thermosash engineers to design, and install the cantilevered glass crowd loaded balustrades and stair handrails and brackets to the upper levels to meet the extremely high barrier loading requirement that was expected.
Woods Glass engineered and manufactured the handrail brackets and had them independently tested to confirm the loading parameters set by the façade engineers.